Home/Services/Roof replacement
Next free inspection Tue 11:30

01 · Roof replacement

Down to the deck and back again

Full tear-off, a photographed deck check, a complete roof system and a fixed written price. Most homes are done in three to five working days by one crew and one foreman.

Typical home

20–40 squares

On site

3–5 days

Warranty

25 years, transferable

Deposit

None until delivery

(Who it is for)

When a new roof is the honest answer

We replace roofs when the problem is spread across whole slopes, not when one flashing or vent has failed. If the inspection shows a repair will give you five good years, the report says so.

Granule loss across a slope

Bare black mat showing, and granules collecting in the gutters and at downspout outlets.

Curling, cupping or cracked tabs

Usually on the south and west slopes first, where the sun is hardest on asphalt.

Soft or bouncing deck

Felt underfoot during the inspection, and confirmed from the attic with a moisture meter.

Repeated leaks in different places

Three repairs in three years is the roof telling you something.

Two layers already

Code allows two layers at most. A third means a full tear-off anyway.

Selling or insuring

Some insurers will not renew on shingle roofs past 20 years.

(What is included)

What is in a Harlow roof replacement

These are the lines you will see on your written scope. Nothing below is an optional extra we add later.

Written scope

Roof replacement

01

Tear-off and disposal

Every layer removed to the deck, dumpster on boards so the drive is protected, magnetic sweep of lawn and drive every evening.

02

Deck check with photos

Every sheet walked and checked before anything is covered. Rotten sheets are replaced at a fixed $88 per sheet, and you get a photo of each one.

03

Ice and water shield

Self-adhered membrane at eaves (two courses, 6 ft up), in every valley and around every chimney, skylight and pipe.

04

Synthetic underlayment

Over the rest of the deck, lapped and cap-nailed, so the house is watertight at the end of every day.

05

Drip edge and starter

Pre-bent metal drip edge at eaves and rakes, starter strip so the first course seals down in wind.

06

Flashing, all new

Step and counter flashing at walls and chimneys, new pipe boots, W-valley metal where the design calls for it. We never reuse old flashing.

07

Roof system

The shingle, steel, slate, tile or cedar you choose, installed to the maker's instructions with a 6-nail pattern on shingle.

08

Ventilation balanced

Ridge vent matched to the soffit intake you have. If intake is missing we price it as its own line.

09

Permit and inspection

We pull the permit and meet the building inspector where your town requires it.

10

Paperwork

Inspection report, fixed written price, a daily build log text with photos, sign-off walkthrough and a 25-year workmanship warranty.

(How it runs)

How a replacement runs, day by day

A 34-square, two-story house with one layer to remove. Bigger roofs add days in the middle, not surprises at the end.

Week 0

Inspection and written price

45 minutes on the roof and in the attic, photo report within 24 hours, fixed written price within 48 hours. You choose material and colour with samples on the house.

Day before

Delivery

Materials on the roof or the drive, dumpster on boards. This is when the 40% invoice goes out, never before.

Day 1

Tear-off and deck

We only open as much roof as we can make watertight by evening. Every replaced deck sheet is photographed. Daily text at 18:00.

Day 2

Dry-in

Ice and water shield, underlayment, drip edge and valley metal. The house is sealed even if the weather turns.

Day 3–4

Roofing and flashing

Shingles or panels go on slope by slope, with new flashing woven in as each course reaches a wall or chimney.

Last day

Ridge, clean-up, walkthrough

Ridge vent and caps, gutters flushed, magnetic sweep. We walk the finished roof with you (or show you the photos) and send the warranty.

(Price guide)

Guide prices for common Ashford Valley homes

Worked out with the same numbers as our estimator. Your fixed price comes after the inspection, because decking and flashing are where estimates go wrong.

Job

What it covers

Guide price

Single-story ranch, 1,500 sq ft

20 squares · 1 layer off · architectural shingle

$11,800–$14,800

Two-story colonial, 1,800 sq ft

24 squares · 1 layer off · architectural shingle

$15,000–$18,700

Two-story, steep, two layers, 2,200 sq ft

34 squares · 2 layers off · architectural shingle

$23,800–$29,700

Two-story in standing seam steel, 1,800 sq ft

24 squares · 1 layer off · standing seam steel

$30,000–$37,500

Cottage in natural slate, 1,200 sq ft

19 squares · 1 layer off · natural slate

$35,400–$44,200

Deck sheets

$88 each, only if needed, each one photographed

Extra layer to remove

$90 per square

Chimney step and counter flashing

From $640 per chimney

Soffit intake where none exists

$12–18 per foot

(Questions)

Straight answers before you call

Still unsure what your roof needs?

(Free inspection)

Find out what your roof actually needs.

A free 45-minute inspection and a photo report within 24 hours. The fixed price follows within 48 hours, with no deposit until materials arrive.